Post-construction cleaning

Rough and final cleans that turn a job site into an occupancy-ready building — stickers, silicone, slurry, and dust removed without damaging tempered or coated glass. Scheduled around your handover date, not ours.

What's Included

Scope of work

Interior and exterior window cleaning, all glass
Sticker and manufacturer label removal from glass and fixtures
Silicone and caulk overspray removal from glass
Concrete slurry and drywall dust removal from windows and frames
Paint overspray spot removal
Protective film removal from windows, appliances, and fixtures
Track and sill detailing
Mirror and glass shower enclosure cleaning
Light fixture and hardware dusting
Common area and lobby glass cleaning
Balcony glass and railing cleaning
Final walkthrough-ready detail pass
Method

How the work is performed

01

Site coordination

Confirm access, unit or floor sequencing, and any live trades still working nearby before crews enter.

02

Debris and dust removal

Bulk construction debris and dust are cleared from surfaces and sightlines before detail work starts.

03

Sticker and label removal

Plastic scraper and adhesive remover lift labels from glass and fixtures without contacting the glass with metal.

04

Silicone and slurry removal

Concrete slurry and caulk overspray are treated with a glass-safe remover and non-abrasive pad, tested first on a small area.

05

Glass and fixture detailing

Interior and exterior glass, mirrors, and hardware are cleaned to a finish-ready standard.

06

Final walkthrough

Crews and, where requested, the site super walk the space together to confirm it's ready for handover.

Access Approach

Access approach

  • Ground crew
    Handles the majority of post-construction interior and exterior detailing at grade and on lower floors.
  • Water-fed pole
    Used for exterior glass on lower elevations where scaffold has already been removed.
  • Boom or scissor lift
    Used for exterior atrium or high entrance glass still accessible from the ground plane.
  • Rope access / swing stage
    Used for tower exteriors when window cleaning is being completed as part of the same handover, coordinated with the general contractor's hoist or scaffold removal schedule.
Pricing

What drives the price

  • Contamination level
    Cured slurry, heavy overspray, or long-dwelling film take longer than a routine post-construction clean.
  • Glass area
    Curtain wall and floor-to-ceiling glazing multiply detailing time per unit or floor.
  • Staging / scheduling
    Compressed handover timelines requiring multiple crews or off-hours work add cost.
  • Access complexity
    High-rise exteriors still needing rope access or lift work add rigging time.
  • Unit or floor count
    Multi-family and multi-tenant projects are typically priced per unit or per floor.
Frequency

Recommended timing

Post-construction cleaning is project-based rather than recurring, but timing within the build schedule affects both cost and quality of finish.

Rough clean — once major trades are substantially complete
Pre-final clean — after painting and flooring, before fixtures installed
Final clean — within days of occupancy or handover walkthrough
Touch-up clean — after deficiency work, before possession
Questions

Frequently asked questions

What's the difference between rough clean and final clean?+

A rough clean happens once trades are substantially done, removing bulk construction debris, dust, and heavy residue so finishing trades can work in a clean space. Final clean happens right before occupancy or handover and is detail-level — glass, fixtures, and surfaces ready for a walkthrough.

How do you remove stickers and labels without scratching glass?+

Manufacturer stickers on tempered or coated glass are lifted with a plastic scraper and adhesive remover, never a metal razor blade, which can scratch coatings or leave micro-scratches that only show up in direct sunlight. Uncoated glass at low risk of coating damage is the only place blade use is considered.

What about concrete slurry and paint overspray on windows?+

Concrete slurry and drywall dust are removed with a combination of water, a non-abrasive pad, and, where cured on, a specialty concrete remover safe for glass. Paint overspray is treated similarly — solvent-based removers are tested on a small area first to confirm they won't haze the glass or damage seals.

Do you remove protective film from windows and fixtures?+

Yes, removing manufacturer protective film is a standard line item in final clean. Film left on too long can bond to the surface, especially in direct sun, so timing this close to occupancy matters — we coordinate with the site super on schedule.

Can you clean occupied floors while construction continues on others?+

Yes, this is common on phased handovers and multi-family podiums. We isolate work zones and schedule around occupied units to avoid dust or debris crossing into finished space.

Next Steps

Related pages

Get a budget estimate, review our insurance and safety credentials, or see recent work in our case studies.

Client Feedback

Trusted by developers at handover

Verified feedback from developers and project managers on our post-construction clean programs.

Read our reviews on Google →
The Spiffy Window Cleaning crew arrived on schedule, were courteous, worked diligently and did a great job. The windows look fantastic. An added bonus - the management and employees are customer oriented and responsive.
James Kellett
Google review
Class act! Super easy to book and showed up on time and did a stellar job! I had all of the glass windows cleaned and let me tell you winter was unkind to all of our sliding glass doors and now they are perfection. Will be booking them again soon!
Jenny Beth Meischl
Google review
David and all of the team at Spiffy are good guys who aim to please. They did a wonderful job on my windows, gutters inside and out, and my deck glass which was covered in years of green algae. I didn't think I needed cleaning, but after it was done, I must say, I do enjoy my clear views.
Karen L
Google review

Get a post-construction clean scoped

Tell us the handover date and unit or floor count and we'll build a crew schedule around it.

Next step

Get a budget number today, or book twenty minutes on site.