Reference

Exterior maintenance glossary

Plain-language definitions for the terms that show up in scopes of work, quotes, and building envelope reports — with a note on why each one actually matters to you.

A
  • AGM

    Annual General Meeting — the yearly strata corporation meeting where owners vote on budgets, including exterior maintenance line items.

    Why it matters to you: Your maintenance budget and contract renewals are usually approved here, so timing your RFP ahead of the AGM matters.

  • Anchor Recertification

    The periodic re-inspection and, where required, load testing of a roof anchor or davit system by a qualified person.

    Why it matters to you: An expired anchor certification can delay or block a scheduled window cleaning or rope access visit.

B
  • Biocide

    A chemical treatment used to kill and inhibit regrowth of algae, moss, and other biological growth on exterior surfaces.

    Why it matters to you: Often paired with soft washing on masonry and cladding affected by biological staining.

  • Boom Lift

    A self-propelled mechanical lift with an articulating or telescopic arm used to reach elevated work from the ground.

    Why it matters to you: Often the fastest, lowest-cost access method for podiums and low-rise buildings with clear ground access.

  • Bosun's Chair

    A simple suspended seat, rigged on rope, used by a technician for spot work or short-duration tasks rather than full-elevation descent.

    Why it matters to you: Useful for quick repairs or inspections without setting up a full rope access or swing stage rig.

C
  • CAM Charges (Common Area Maintenance)

    Operating costs, including exterior maintenance, recovered from tenants under a commercial lease.

    Why it matters to you: Determines whether exterior maintenance cost is absorbed by the landlord or passed through to tenants.

  • Certificate of Insurance (COI)

    A document issued by a contractor's insurer confirming active liability coverage and policy limits.

    Why it matters to you: You should require a current COI before any contractor accesses your building or roof.

  • Cladding

    The exterior finish material applied over a building's structural frame, such as metal panel, masonry, or curtain wall glazing.

    Why it matters to you: Cladding type is the single biggest factor in choosing a safe and effective cleaning method.

  • Clerestory

    A row of windows set high in a wall, often above roof lines of adjoining sections, used to bring in daylight.

    Why it matters to you: Common on industrial buildings and often requires a lift or rope access even on an otherwise low building.

  • Condition Report

    A written record, often with photographs, documenting the state of a building's exterior at a point in time.

    Why it matters to you: Establishes a baseline so pre-existing damage isn't later mistaken for something a contractor caused.

  • Curtain Wall

    A non-structural, unitized exterior wall system of glass and aluminum framing hung off a building's slab edge.

    Why it matters to you: The dominant construction type on Vancouver high-rises — understanding it explains most facade failure modes.

D
  • Davit Arm

    A pivoting arm mounted on a roof used to hoist and support a swing stage platform for suspended access.

    Why it matters to you: Its inspection and load-test status determines whether swing stage access is available for your building.

  • Depreciation Report

    A mandatory long-term financial planning document for BC stratas that forecasts repair and replacement costs for common property, including the building envelope.

    Why it matters to you: Exterior maintenance frequency and budget should align with the depreciation report's envelope assumptions.

  • Downstreaming

    A water-fed pole technique where purified water flows continuously through the brush head while cleaning, rather than being applied and squeegeed separately.

    Why it matters to you: Produces a spot-free finish without a technician needing to dry the glass by hand.

E
  • Efflorescence

    A white, powdery mineral deposit that forms on masonry surfaces as water carries dissolved salts to the surface and evaporates.

    Why it matters to you: A visible sign of moisture movement through a wall assembly that's worth monitoring, not just cleaning away.

  • EIFS

    Exterior Insulation and Finish System — a lightweight synthetic stucco cladding system over rigid insulation.

    Why it matters to you: Requires low-pressure soft washing; high-pressure cleaning can drive water behind the panel and cause hidden damage.

  • Encroachment Permit

    A municipal permit allowing temporary use of public sidewalk or roadway space for equipment such as a boom lift or scaffold.

    Why it matters to you: Required whenever equipment or its swing radius extends past the property line into public space.

F
  • Fall Arrest

    A fall-protection system designed to stop a fall that has already begun, using a shock-absorbing lanyard and full-body harness.

    Why it matters to you: Required for rope access and swing stage work where a fall is physically possible during the task.

  • Fall Restraint

    A fall-protection system designed to prevent a worker from reaching a fall hazard in the first place, typically a fixed-length lanyard.

    Why it matters to you: Used on boom lifts, where the goal is to keep the operator inside the platform rather than arrest a fall from it.

  • Fenestration

    The overall arrangement, proportion, and design of windows and other exterior openings on a building.

    Why it matters to you: A useful term when discussing facade design intent with an architect or engineer alongside your maintenance plan.

G
  • Gasket

    A rubber or synthetic seal installed between glazing components to accommodate movement and block water and air infiltration.

    Why it matters to you: Shrinking or displaced gaskets are an early, low-cost-to-fix warning sign of future water infiltration.

  • Ground Crew

    Technicians performing cleaning or maintenance work from the ground rather than an elevated platform or rope system.

    Why it matters to you: Handles entrances, podium glass, and any elevation reachable without elevated access.

H
  • Handover Standard

    The condition benchmark a building's exterior must meet before being turned over from a developer to an owner or strata.

    Why it matters to you: Sets the baseline expectation for a new building's first professional exterior clean.

  • Hard Water Etching

    Permanent damage to glass caused by repeated deposits of mineral-laden water that aren't fully rinsed before drying.

    Why it matters to you: Once etching reaches Stage 3 or 4, only glass restoration or replacement — not cleaning — will fix it.

I
  • IGU (Insulated Glazing Unit)

    A sealed glass unit made of two or more panes with a gas-filled or vacuum space between them for thermal performance.

    Why it matters to you: A fogged IGU means the seal has failed and the unit needs replacement, not additional cleaning.

  • IRATA

    Industrial Rope Access Trade Association — an international certification body for rope access technicians.

    Why it matters to you: IRATA certification is a baseline credential to check for on any rope access crew working on your building.

  • ITT (Invitation to Tender)

    A formal procurement document inviting qualified contractors to submit a priced bid against a defined scope of work.

    Why it matters to you: More formal and binding than an RFP — typically used for larger, competitively scored contracts.

  • IWCA

    International Window Cleaning Association — an industry association providing training and safety standards for the window cleaning trade.

    Why it matters to you: IWCA-aligned training is a useful reference point when evaluating a contractor's safety program.

J
  • Jobsite Hazard Assessment (JHA)

    A documented, site-specific review of hazards and controls completed before work begins.

    Why it matters to you: A contractor without a JHA process for elevated or chemical work is a compliance gap worth flagging.

L
  • Low-E Coating

    A microscopically thin metallic coating applied to glass to reduce heat transfer while allowing visible light through.

    Why it matters to you: Requires non-abrasive cleaning methods — scraping or aggressive pads can damage the coating and void warranties.

M
  • Mansard

    A steeply sloped roof or facade section, often at the top of a building, that combines roof and wall geometry.

    Why it matters to you: Frequently the most difficult section of a facade to access and is often priced separately in a scope of work.

  • Membrane Roof

    A single-ply or built-up waterproofing layer applied to a low-slope roof to prevent water infiltration.

    Why it matters to you: Blocked drains on a membrane roof are a leading cause of ponding and premature membrane failure.

  • Mineral Etching

    See Hard Water Etching — permanent glass surface damage caused by unrinsed mineral deposits.

    Why it matters to you: Prevention through regular cleaning is far cheaper than restoration or replacement after etching sets in.

  • Mullion

    The vertical or horizontal structural member that separates and joins adjacent panes of glass in a curtain wall system.

    Why it matters to you: Mullion-to-glass sealant joints are one of the most common points of water infiltration on a curtain wall building.

O
  • OHS Regulation

    The Occupational Health and Safety Regulation issued by WorkSafeBC, setting binding workplace safety rules across BC.

    Why it matters to you: Parts 13 and 34 specifically govern elevated work platforms and window cleaning — the rules your contractor must follow.

P
  • Parapet

    A low protective wall along the edge of a roof, terrace, or balcony.

    Why it matters to you: Often the anchor location or tie-back point for rope access and swing stage rigging.

  • Podium

    The low-rise base of a mixed-use building, typically housing retail or amenity space, on which a tower is set back and built above.

    Why it matters to you: Podium and tower usually need separate cleaning frequencies and access plans on the same building.

  • Pressure Washing

    Cleaning using high-pressure water, typically above 1,000 psi, suited to durable surfaces like concrete and hardscape.

    Why it matters to you: The wrong choice for masonry, EIFS, or older cladding, where it can force moisture into the wall assembly.

  • Punched Window

    An individual window opening set into a load-bearing wall, as opposed to a continuous curtain wall system.

    Why it matters to you: Failures are more localized than curtain wall, since the surrounding wall sheds water independently of the window.

  • Purified Water

    Water treated through resin deionization and/or reverse osmosis to remove dissolved minerals.

    Why it matters to you: Enables spot-free drying without squeegeeing, which is what makes water-fed pole cleaning practical.

R
  • Rappel

    The controlled descent technique used by rope access technicians moving down a rope from an anchor point.

    Why it matters to you: A basic term for understanding how rope access technicians move across a facade.

  • Reclaim (Water Reclaim)

    A system that captures and filters wastewater during pressure washing to prevent it from entering storm drains untreated.

    Why it matters to you: Often required by municipal bylaw for pressure washing near storm connections.

  • RFP (Request for Proposal)

    A procurement document describing a scope of work and inviting contractors to propose an approach and price.

    Why it matters to you: Less rigid than an ITT — allows contractors to propose their own methodology alongside price.

  • RFQ (Request for Quote)

    A procurement document requesting a straightforward price against a clearly defined, unchanging scope.

    Why it matters to you: Best used when the scope is well understood and price is the primary differentiator between bidders.

  • Roof Descent System (RDS)

    An engineered anchor system, often combined with a rope or cable system, purpose-built for controlled descent from a roof.

    Why it matters to you: A permanent RDS on your building can significantly reduce rigging time and cost for recurring cleaning visits.

S
  • SDS (Safety Data Sheet)

    A standardized document detailing the hazards, handling, and first-aid measures for a chemical product.

    Why it matters to you: Your contractor should have an SDS on hand for every cleaning chemical used on your property.

  • Sealant

    A flexible, weatherproofing compound applied at joints between building materials to block water and air infiltration.

    Why it matters to you: Cracked, chalky, or receding sealant found during a cleaning visit should be logged and reported, not ignored.

  • Sill

    The horizontal bottom edge of a window or door opening.

    Why it matters to you: A common collection point for debris and standing water that's often included as a separate line item in a cleaning scope.

  • Soft Washing

    A low-pressure cleaning method, often combined with a biocidal or detergent solution, suited to delicate substrates.

    Why it matters to you: The correct method for EIFS, stucco, masonry, and painted concrete where high pressure would cause damage.

  • Spalling

    The cracking, flaking, or breaking away of a masonry or concrete surface, often caused by trapped moisture freezing and expanding.

    Why it matters to you: A structural concern, not a cosmetic one — spalling found during cleaning should be reported to the building's engineer.

  • Spandrel

    The opaque glass or panel section of a curtain wall that conceals the floor slab and structural elements between vision glass bands.

    Why it matters to you: Spandrel panels can discolour differently than vision glass and are sometimes mistakenly cleaned with the wrong method.

  • SPRAT

    Society of Professional Rope Access Technicians — a North American certification body for rope access technicians, parallel to IRATA.

    Why it matters to you: A common alternative certification to check for on rope access crews working in North America.

  • Squeegee

    A rubber-bladed hand tool used to remove water and cleaning solution from glass during traditional window cleaning.

    Why it matters to you: Contrasted with purified-water methods, which dry spot-free without one.

  • Stage 1 Glass Damage

    The earliest stage of mineral deposit or etching on glass — light, surface-level buildup that's fully removable with standard cleaning.

    Why it matters to you: Cleaning at this stage prevents progression to permanent etching later.

  • Stage 2 Glass Damage

    Moderate mineral buildup requiring a more aggressive but still non-abrasive cleaning treatment to fully remove.

    Why it matters to you: Still reversible, but typically needs a specialized restoration pass rather than routine cleaning.

  • Stage 3 Glass Damage

    Mineral deposits that have begun to etch into the glass surface, leaving some permanent haze even after treatment.

    Why it matters to you: Restoration can improve appearance but may not fully reverse the damage at this stage.

  • Stage 4 Glass Damage

    Severe, permanent etching or pitting of the glass surface that cleaning or restoration cannot correct.

    Why it matters to you: At this stage, glass replacement is usually the only remaining option.

  • Strata Council

    The elected group of owners responsible for governing a BC strata corporation's common property and finances between AGMs.

    Why it matters to you: The strata council typically approves and manages the exterior maintenance contract on behalf of all owners.

  • Swing Stage

    A suspended work platform hoisted from a roof davit or track system for full-elevation access.

    Why it matters to you: The fastest way to cover large, flat elevations once rigged, but requires a permanent, certified davit or track system.

T
  • Tie-Back

    A secondary anchor line securing a swing stage or rigging point independently of the primary hoist system.

    Why it matters to you: A required redundancy — its absence or poor condition is a safety red flag on any suspended access job.

W
  • Water-Fed Pole

    A telescoping pole system that delivers purified water through a brush head to clean glass from the ground.

    Why it matters to you: The fastest, lowest-disruption method for glass within roughly four to six storeys of the ground.

  • WCB Clearance Letter

    A document from WorkSafeBC confirming a contractor's account is in good standing and premiums are paid.

    Why it matters to you: Protects you from liability for a contractor's workplace injury claims — always confirm this is current.

  • WHMIS

    Workplace Hazardous Materials Information System — Canada's standardized system for classifying and communicating chemical hazards.

    Why it matters to you: Your contractor's crew should be WHMIS trained for any chemicals used on your property.

  • Wind Hold

    A scheduled pause in elevated work when wind speed at height exceeds a contractor's safety threshold.

    Why it matters to you: A normal part of scheduling suspended access work — build float into any hard deadline.

  • WorkSafeBC

    British Columbia's workplace health and safety regulator and workers' compensation insurer.

    Why it matters to you: Sets the binding safety rules for every access method covered on this site and issues the clearance letters you should request.

Still have a term-specific question?

Send us the term or the document it's from and we'll explain what it means for your building.

Next step

Get a budget number today, or book twenty minutes on site.