Budget Estimator

Build a defensible planning range in four steps.

A budgetary range for commercial exterior maintenance in Metro Vancouver — with a downloadable branded PDF for your file. This is a planning tool, not a quote; a site walkthrough confirms final pricing.

  1. 1Building
  2. 2Access & scope
  3. 3Frequency & site
  4. 4Review

Pre-filled from your building-type guide: School / college / campus. Change it below if it doesn't match your property.

Building type
12 storeys

Rough is fine — a curtain-wall office tower is often 60–80% glazing; a strata building is typically 20–35%. We confirm the exact count on a site visit.

Planning range · not a quote
Per visit
$9,540$13,470
Annual total · 4 visits / year
$36,260$51,190

This is a budgetary planning range in Canadian dollars, before tax — not a quote. Access: Rope access (IRATA-certified technicians). Complexity: Standard. Final pricing is confirmed after a site walkthrough.

Get a firm quote →Call 604-830-1312
How To Use This

For the budget draft, not the contract.

This estimator exists because budget season arrives before quotes do. It gives you a defensible range — with the assumptions and exclusions spelled out — to put in a draft operating budget or a depreciation report line, months before a vendor is selected.

Every multiplier in the model is disclosed on this page, and the same figures appear in the downloadable PDF, so the range can be explained to a council or a procurement desk without a black box.

Want the range narrowed into a real number? Send the building address to commercial@spiffybluelabel.com and we will schedule a site visit.

Next step

Get a budget number today, or book twenty minutes on site.